Raw wastewater pumping station for Münster City
Raw wastewater pumping station (separate system) Münster- Wolbeck/ Loddenbach
The wastewater is tainted with many fibrous materials because of connection with various dischargers. The channel pumps previously in operation occurred many clogging problems. This clogging problem has been solved since the Egger TA pumps have been installed 5 months ago. The pump was tested during 3 months before acceptance.