Archive for July, 2016

  • Increasing the availability of intake pump stations – Case study

    The Saarland Waste Disposal Association significantly increased its plant intake pump station availability by exchanging existing impeller channel pumps...

  • Energy saving with Iris® Diaphragm Control Valves on WWTP Chemnitz

    As part of an energy optimization at the WWTP Chemnitz, a total of 30 control valves were replaced by...

  • Diplomed Apprentices 2016 Egger Cressier

    Egger apprentices received their diploma

    We have the pleasure to  announce the successful apprenticeship diploma of our following apprentices (from left to right): Sefa Ürer, multi-skilled...