Raw wastewater pumping station for Münster City

Raw wastewater pumping station for Münster City
October 17, 2016 Beatrice Baumann
Beatrice Baumann October 17, 2016
German

Raw wastewater pumping station for Münster City

Raw wastewater pumping station (separate system) Münster- Wolbeck/ Loddenbach

The wastewater is tainted with many fibrous materials because of connection with various dischargers. The channel pumps previously in operation occurred many clogging problems. This clogging problem has been solved since the Egger TA pumps have been installed 5 months ago. The pump was tested during 3 months before acceptance.

IMG_6020

0 Comments

Leave a reply

Your email address will not be published. Required fields are marked *

*